Nick @ Noon | Introducing Tim
Introducing our newest addition to the team, Tim Patterson has been brought on as a Development Associate to aid in the making of Riverton! Please give Tim a warm welcome!
Nick @ Noon | V-Zone Wall Update
Our onsite team has made substantial progress along our waterfront! Extending the rebar footing of the V-Zone Wall southbound to form the base for this 825 FT Flood Impact Wall.
Nick @ Noon | Gabion Walls
Gabion Walls are common but unfamiliar to most, they are a useful method to prevent soil erosion! They’re also eco-friendly, using recycled stone inside as an alternative to a concrete wall structure.
Nick @ Noon | Wet Pond Update
We have completed the head walls at the Wet Pond and are working on some finishing touches! Check out the progress.
Nick @ Noon | V-Zone Flood Impact Wall
A peek at the process for how our contracting team’s install the wood piles that create the base structure of the Velocity Zone Flood Impact Wall!
Nick @ Noon | Velocity-Zone Flood Impact Wall
Our Velocity-Zone Flood Impact Wall is underway! This was will act as a protective barrier from a potential major super storm (like super storm Sandy)! Our contracting team is currently driving wood piles as the supporting structure of the wall, stay tuned for additional updates.
Nick @ Noon | Road Opening
A quick look at performing a road opening for an excavation below the surface of a road. Many steps to coordinate, but if planned ahead of time, it’s a seamless process!
Nick @ Noon | Dig Operation
A “Soft Dig” is a common excavation method used to expose underground utilities (sub-terrain infrastructure) without causing damage to the utility & having minimal environmental impact! Our team used an air pressure method (like a vacuum) but another common method is hydrovac excavation using water pressure (like a power washer).
Nick @ Noon | Wet Pond Headwall
How do you support a 96-inch storm pipe? With a headwall, of course! See the process of how the concrete headwall is constructed at the wet pond! Wet ponds provide a permanent solution to store stormwater runoff. Check out this previous Nick @ Noon to learn more https://vimeo.com/716061417
Nick @ Noon | Shallow Utilities
A closer look at the pieces involved in installing Shallow Utilities at Riverton. Can you guess how many sanitary structures are included along Riverton Boulevard?